 Post Tension Slab

Job Site: Heatherwood Apartments 13510 North Creek Drive Mill Creek, WA 98012
General Contractor: Heartland Construction, Inc.
Project Owner: Heatherwood I, LLC
Scope of Work: This complex consists of eight buildings with 188 units. One building was built on a post tension slab with parking below. There was 11 detached garage buildings, which included 66 parking spaces and 22 apartments above, a recreation building with pool and spa, a day center, a dumpster enclosure and a mail kiosk. |